Handover is where project closeout is won or lost. It is the point where risk, responsibility and information formally pass from your site team to your client and FM partners, and where missing documents, inconsistent O&M packs and Excel-driven chaos can quickly damage relationships and delay practical completion.
Our top 10 Tips for Seamless Construction Project Handover Checklist distils the core actions that turn fragmented closeout activity into a structured, digital process your teams can repeat across every job.
Download the checklist to learn how to:
- Start handover planning early, with 60% of documentation drafted well before PC so you avoid last‑minute chases.
- Set your supply chain up for success with clear handover requirements, trade-specific templates and live progress tracking.
- Standardise your O&M manuals and construction handover templates so clients and FM teams can actually find what they need, fast.
- Align outputs with site geography — by block, floor, tenure or asset type — rather than handing over contractor-centric file dumps.
- Replace email chains, CDE exports and Excel trackers with specialist digital handover tools and dashboards that provide a single source of truth.
Download the checklist for a clear, actionable starting point to turn handover into a competitive advantage.